Kalinin Nuclear Power Plant

The Kalinin Nuclear Power Plant is located about 200 kilometres (120 mi) north west of Moscow, in Tver Oblast near the town of Udomlya. Owner and operator of the plant is the state enterprise Energoatom. Kalinin Nuclear Power Station supplies the majority of electricity in the Tver region and additionally serves Moscow, Saint Petersburg, and Vladimir. In 2005 the nuclear power station fed 17.3 TWh (62,000 TJ) into the grid. The station's four 150 metres (490 ft) tall cooling towers are local landmarks. They were manufactured in 96 concrete sections each.

By March 2009 the containment structure of the new Kalinin Unit 4 reactor was nearly complete. This reactor is planned to become operational in 2011.

The Kalinin Nuclear Power Plant has four nuclear reactor units:

Unit Reactor type Net
capacity
Gross
capacity
Commercial
Operation
Shutdown
Kalinin - 1 VVER-1000/338 950 MW 1,000 MW 1985/06/12 2014
Kalinin - 2 VVER-1000/338 950 MW 1,000 MW 1987/03/03 2016
Kalinin - 3 VVER-1000/320 950 MW 1,000 MW 2005/11/08 2043
Kalinin - 4 VVER-1000/320 950 MW 1,000 MW - -


Kalinin Nuclear Power Plant
Country Russia
Coordinates 57°54′20″N 35°03′37″E / 57.90556°N 35.06028°E / 57.90556; 35.06028 / 57.90556; 35.06028
Status Operational
Construction began February 1, 1977
Commission date June 12, 1985
Operator(s) Energoatom

Reactor information
Reactors operational 3 x 1000 MW
Reactors under construction 1 x 1000 MW

Power generation information
Annual generation 20,106 GW·h
Net generation 261,722 GW·h

Balakovo Nuclear Power Plant

Balakovo nuclear power plant is located in the city of Balakovo, Saratov Oblast, Russia, about 900 kilometers south-east of Moscow. It consists of four operational reactors; a fifth unit is still under construction. Owner and operator of the nuclear power station is Energoatom.

Balakovo is the partner power station of Biblis Nuclear Power Plant.

In 27 June 1985, during initial startup of the reactor 1, due to a human error (caused by inexperience and haste) a pressurizer relief valve unexpectedly opened and 300 °C hot steam entered the staff work area. 14 people were killed. This event is quoted as one of the predecessors of the Chernobyl disaster.

Unit Reactor type Net
capacity
Gross
capacity
Construction
started
Electricity
Grid
Commercial
Operation
Balakovo - 1 WWER-1000/320 950 MW 1.000 MW 01.12.1980 28.12.1985 23.05.1986
Balakovo - 2 WWER-1000/320 950 MW 1.000 MW 01.08.1981 08.10.1987 12.01.1988
Balakovo - 3 WWER-1000/320 950 MW 1.000 MW 01.11.1982 25.12.1988 08.04.1989
Balakovo - 4 WWER-1000/320 950 MW 1.000 MW 01.04.1984 12.05.1993 22.12.1993
Balakovo Nuclear Power Plant
Data
Country Russia
Operator Energoatom
Built December 1, 1980
Start of commercial operation May 23, 1986
Reactors
Reactors active 4 (4,000 MW)
Reactors under construction 1 (1,000 MW)
Power
Total power generation in 2006 29,062 GW·h
Average annual generation (last 5 yrs) 27,720 GW·h
Net generation 387,580 GW·h
Status Operating