The Kola Nuclear Power Plant (NPP) also known as Kolsk NPP or Kolskaya NPP, is a nuclear power plant in northern Russia.

The Phase 1 (No. 1 and 2 reactors) at the Kola NPP went online in 1973 and 1974, respectively, and are part of Russia’s first generation of PWR reactors (the VVER 440/230 type). The Phase 2 (No. 2 and 3 reactors) went online in 1981 and 1984 with improved VVER 440/213 type.

Phase 1 reactors were designed to work for 30 years and were originally slated to be shut down in 2003 and 2004. However the shutdown did not happen. Instead, the operational life spans of the reactors were extended, after massive safety upgrade effort that included about 200 safety systems upgrade projects and was financed in part by governments of Norway, Sweden, Finland and USA

Kola Nuclear Power Plant (NPP) produces about half of all Murmansk Oblast's energy. It is a similar type of reactor to Finland's Loviisa Nuclear Power Plant, which conforms to regulatory requirements commonly considered to be the most stringent in the world.

Reactor data

The Kola Nuclear Power Plant has four units:

Unit Reactor type Net
capacity
Gross
capacity
Commercial
Operation
Shutdown
Kola-1 VVER-440/230 411 MW 440 MW 28.12.1973 2018
Kola-2 VVER-440/230 411 MW 440 MW 21.02.1975 2019
Kola-3 VVER-440/213 411 MW 440 MW 03.12.1982 2036
Kola-4 VVER-440/213 411 MW 440 MW 06.12.1984 2014

Campaign to close the station

Several Environment movement groups support media campaign to close Kola NPP citing safety concerns with Phase 1 reactors and alleged violations of Russian law during issue of operating permit extensions. For comparison, relatively closely located Finland's Loviisa Nuclear Power Plant that uses the same reactor type as Kola phase 1 reactors (VVER 440/230 type) operational since 1977, doesn't draw criticism from the same influence groups.

The license for phase 1 reactors five-year operation extensions, granted by the Russian Federation's civilian nuclear regulator Gosatomnadzor (FSETAN’s predecessor), were issued without conducting an obligatory state environmental impact study. Conducting such federal level studies is mandated by the law "On Environmental Impact Studies" in Article 11.

The first extension for the old reactors was issued in summer 2003, almost precisely after former Deputy Minister of Atomic Energy Andrei Malyshev was installed as Gosatomnadzor’s chief. He replaced Yury Vishnevsky at this post. Vishnevsky had been an outspoken critic of the former Ministry of Atomic Energy, now known as the Federal Agency for Atomic energy, or Rosatom.

In April 2005, the Murmansk Regional Prosecutor issued a recommendation to resolve the violations surrounding the reactor life-span extensions and force regulatory bodies and Rosenergoatom, Russian's nuclear power plant operations conglomerate, to carry out the environmental impact studies. But none of this took place.

The Murmansk Prosecutors again ordered the state structures to fulfill the earlier order, but was again unsuccessful. Norway's Nature and Youth and Norway-based Bellona’s "Environment and Rights" magazine first drew the attention of prosecutors to the illegality of prolonging the life-spans of the reactors in 2004.

Rostekhnadzor subsequently issued a license for the fifteen year life extension of Unit 1 in June 2008, after further reviews, inspections and upgrade work.
Kola Nuclear Power Plant
Country Russia
Status Operational
Construction began 1970
Commission date 28 December 1973
Operator(s) Energoatom

Reactor information
Reactors operational 4 x 440 MW

Power generation information
Annual generation 9,846 GW·h
Net generation 275,825 GW·h