skip to main |
skip to sidebar
Home »
Nuclear Power Plant in Japan
»
Sendai Nuclear Power Plant
Sendai Nuclear Power Plant
5:58 AM
Posted by Energetic
The Sendai Nuclear Power Plant is a nuclear power plant located in the city of Satsumasendai in the Kagoshima Prefecture. It is owned and operated by the Kyūshū Electric Power Company.
The plant is on a site of 1.45 km2 (358 acres), employs 277 workers, and indirectly employs 790.
The reactors are of the 3-loop M type pressurized water reactor, built by Mitsubishi Heavy Industries.Reactors on Site
Name | Reactor Type | Commission date | Gross Power Rating | Core Tonnage | Price to build |
---|---|---|---|---|---|
Sendai-1 | PWR | July 4, 1984 | 890 MW | 72 tons/uranium dioxide | 278.7 billion Yen |
Sendai-2 | PWR | November 28, 1985 | 890 MW | 72 tons/uranium dioxide | 228.7 billion Yen |
Sendai Nuclear Power Plant | |
---|---|
Country | Japan |
Construction began | December 15, 1979 |
Commission date | July 4, 1984 |
Operator(s) | Kyūshū Electric Power Company |
Reactor information | |
Reactors operational | 2 x 890 MW {gross) 2 x 846 MW {net) |
Power generation information | |
Annual generation | 12,901 GW·h |
Net generation | 276,655 GW·h |
Related Post
This entry was posted on October 4, 2009 at 12:14 pm, and is filed under
Nuclear Power Plant in Japan
. Follow any responses to this post through RSS. You can leave a response, or trackback from your own site.