Nuclear Power Plant in Germany
»
Biblis Nuclear Power Plant
Biblis Nuclear Power Plant
8:05 AM
Posted by Energetic
The Biblis Nuclear Power Plant is in the South Hessian municipality of Biblis and consists of two units: unit A with a gross output of 1200 megawatts and unit B with a gross output of 1300 megawatts. Both units are pressurized water reactors. The operator of this nuclear power plant is the German RWE ("Rheinisch-Westfälisches Elektrizitätswerk AG"), an electrical utility based in Essen. unit A began operation on July 16, 1974 and entered commercial service on August 25, 1974. unit B reached criticality on March 25, 1976.
On December 17, 1987 an incident (INES 1) occurred: Coworkers overlooked a stop valve that had not been closed. In order to close the armature a valve was opened. Radioactive primary cooling agent discharged for a short time into the annular space. Because the discharge of the reactor cooling water took place outside of the reactor containment, there was no feedback from the sump over the safety feeding pumps and/or cooling pumps. The incident became public one year later, when an article in an American technical periodical (Nucleonic Weeks) was published. There have been other incidents afterwards, none of which has been rated over 1 on INES scale.
In the course of a routine swap of unit A's fuel assembly in September 2010 a malfunction of its emergency system was detected. The automated switchover of the power supply from unit B to A proved broken, which meant that the ability to perform countermeasures would have been severely impaired in case of an emergency. Previous demands by Germany's Green party and the IPPNW to construct an external control stand were refused by Hessen's environment minister Lucia Puttrich (CDU) on the ground that both units could provide each other with energy should an incident occur.
Biblis Nuclear Power Plant is the partner power station of the Balakovo Nuclear Power Plant.
Biblis Nuclear Power Plant | |
---|---|
Country | Germany |
Locale | Biblis |
Status | Operational |
Construction began | 1969 |
Commission date | August 25, 1974 |
Operator(s) | RWE |
Constructor(s) | Siemens Hochtief |
Turbine information | |
Manufacturer(s) | Siemens |
Power generation information | |
Installed capacity | 2,525 MW |
Annual generation | 15,306 GW·h |
Net generation | 439,973 GW·h |
Related Post
This entry was posted on October 4, 2009 at 12:14 pm, and is filed under
Nuclear Power Plant in Germany
. Follow any responses to this post through RSS. You can leave a response, or trackback from your own site.