The Sequoyah Nuclear Power Plant is a nuclear power plant located on 525 acres (2.1 km²) located 7 miles east of Soddy-Daisy, Tennessee, and 20 miles north of Chattanooga, abutting Chickamauga Lake, on the Tennessee River. The facility is owned and operated by the Tennessee Valley Authority (TVA).

The Sequoyah Nuclear Power Plant has two Westinghouse pressurized water reactors. Sequoyah units 1 & 2, as well as their sister plant at Watts Bar, both have ice condenser containment systems. In case of a large loss of coolant accident, steam generated by the leak is directed toward borated ice which helps condense the steam creating a lower pressure, allowing for a smaller containment building.

Sequoyah's two units have a winter net dependable capacity of 2,333 megawatts, making Sequoyah the most productive of TVA's four nuclear plants. Sequoyah is the second-most powerful electric plant in the entire TVA system, second only to the Cumberland coal-fired plant northwest of Nashville. Following the restart of Brown's Ferry Unit 1, that plant again became most productive at 3,440 MW.

The operating license of Sequoyah's Unit 1 expires in 2020. Unit 2's operating license expires in 2021.

TVA constructed dry cask storage facilities at Sequoyah and purchased special storage containers for the purpose of storing spent nuclear fuel. The storage facilities have been approved by the NRC.

TVA's Sequoyah operating license was modified in September 2002 to allow TVA to irradiate tritium-producing burnable absorber rods at Sequoyah for the U.S. Department of Energy. The process of irradiating tritium-producing rods produces tritium, which is used in nuclear weapons. TVA began irradiating tritium-producing rods at its Watts Bar Nuclear Generating Station in 2003. As of February 2007, TVA had no plans to produce tritium at Sequoyah Nuclear Power Plant.
Sequoyah Nuclear Plant
Country United States
Locale Soddy-Daisy, Tennessee
Status Operational
Construction began 1969–80
Commission date Unit 1: July 1, 1981
Unit 2: June 1, 1982
Licence expiration Unit 1: Sept. 17, 2020
Unit 2: Sept. 15, 2021
Operator(s) Tennessee Valley Authority
Architect(s) TVA

Reactor information
Reactors operational 1148 MW
1126 MW
Reactor type(s) pressurized water reactor
Reactor supplier(s) Westinghouse

Power generation information
Annual generation 18,651 GW·h