skip to main |
skip to sidebar
Home »
Nuclear Power Plant in United States
»
North Anna Nuclear Power Plant
North Anna Nuclear Power Plant
7:51 AM
Posted by Energetic
The North Anna Nuclear Power Plant is a nuclear power plant on a 1,075-acre (4.35 km2) site in Louisa County, Virginia. The site is operated by Dominion Generation company and is jointly owned by the Dominion Virginia Power corporation (88.4%) and by the Old Dominion Electric Cooperative (11.6%).
The North Anna Nuclear Power Plant has two Westinghouse pressurized water reactors which went on-line in 1978 and 1980 respectively. Together the reactors generate 1.79 gigawatts of power, which is distributed mainly to the greater Richmond area and to Northern Virginia. In March 2003, the NRC approved 20 year license extensions for both Units 1 & 2.
An artificial lake, Lake Anna, was constructed on the North Anna River to provide a reservoir of water coolant for use with the nuclear plant. Exhaustive studies have shown that the lake's abundant aquatic life are not harmed by the plant's operation.
Dominion currently owns nuclear power plants in Virginia (North Anna, Surry), Connecticut (Millstone), and Wisconsin (Kewaunee). North Anna is similar in design and appearance to Surry Power Station.
Unit 3
North Anna Nuclear Power Plant is currently going through the lengthy process of obtaining regulatory permission to build an additional unit at the site. Dominion Nuclear North Anna, LLC submitted its application for an Early Site Permit (ESP) for the North Anna site on September 25, 2003. The U.S. Nuclear Regulatory Commission (NRC) issued the ESP on November 27, 2007. On the same day, Dominion submitted an application for a Combined Construction and Operating License (COL) for a 1,520 MWe GE–Hitachi Economic Simplified Boiling Water Reactor (ESBWR), designated as North Anna Unit 3.
In 2009, having failed to agree on terms for an engineering construction and procurement deal with GE-Hitachi to actually build the reactor, Dominion issued a new request for proposals from reactor vendors. In 2010, Dominion announced that it had selected a 1,700 MWe, US-specific version of Mitsubishi Heavy Industries' (MHI) Advanced Pressurized Water Reactor (APWR) for the potential Unit 3.
Proposed plans to add a new reactor to the North Anna site have brought public protest. On August 7, 2008 six activists from the Peoples Alliance for Clean Energy were arrested at the North Anna Information Center for trespassing.
On Oct 29, 2010 Dominion president Tom Farrell told investors that Dominion had decided to slow its development of the proposed third reactor and wait until the combined construction permit-operating license (COL) was approved by the NRC before deciding to complete the project. This approval is expected in early 2013.North Anna Nuclear Power Plant | |
---|---|
Country | United States |
Locale | Louisa County, near Mineral, Virginia |
Status | Operational |
Commission date | Unit 1: June 6, 1978 Unit 2: December 14, 1980 |
Licence expiration | Unit 1: April 1, 2038 Unit 2: August 21, 2040 |
Operator(s) | Dominion |
Architect(s) | Stone & Webster (Units 1 & 2) |
Reactor information | |
Reactors operational | 1,790 MW (2 reactors) |
Reactors planned | 1 x 1,700 MW |
Reactor type(s) | Pressurized water reactor |
Reactor supplier(s) | Westinghouse |
Related Post
This entry was posted on October 4, 2009 at 12:14 pm, and is filed under
Nuclear Power Plant in United States
. Follow any responses to this post through RSS. You can leave a response, or trackback from your own site.